Email FSR May 2012is att The The upgr Nobl The Sign Nort ï‚§ N r ï‚§ N r ï‚§ N a New ï‚§ N ï‚§ N ï‚§ N ï‚§ N ï‚§ N ï‚§ N e d This Repo Statu ached to thi Company's Company w ade ...
noblecorp.com/docs/ne_fleetstatus.pdf
DOWNLOAD
| Find Similar
advertisement
Text Previews (text result may be not accurate)
ached to th
Compan
Company
ade project
e's and its
Compan
ificant high
eported.)
eported.)
xpected to
summary i
rt. While
ill continue
. Timing a
ustomers’ s
nticipates
ights of the
trotter I:
nter the shi
e have atte
vailable in
to report pl
hedule(s).
its
New C
reviously
i
perienced 1
pted to in
rt include:
ntracts/E
eported.)
llen
el formats
uced dayrat
paid time d
leg
inimum of
tended to r
e believe i
s Report on
tional do
me by rig c
re subject t
tters of Int
4 at a dayra
at a dayrat
ter of inten
of $461,00
of $328,0
damage wh
significant,
ntime is ex
vering reg
o, among ot
te of $275,0
starting in
2, while ri
le moving
The Comp
ected to t
latory inspe
er things,
ly reported.
ed to revi
f the report
tal 3.5%.
ctions and
n wells.
te shipyard
w the Flee
o 90001999/200912,000'-DPUS GOMShellEarl
2011Earl
Noble Jim DayBingo 90001999/201012,000'-DPUS GOMShellEarly Feb 2012Late Apr 2012530Eligible for a maximum 15% bonus.
US GOMDeep Gulf
Mid Jun
550One well contract, estimated +/- 45 days.
US GOMMurphy
Late Jul
565One well contract, estimated +/- 45 days.
US GOMERT
Early Sep
605One well contract, estimated +/- 45 days.
Late Dec 2012-Available.
Noble EVA 4000™1982/19998,000'US GOMLLOGMid Dec 2011Mid Se
t 2012360
US GOMLLOGMid Se
2012Mid Nov 2013460
Noble EVA 4000™ 1984/19996,000'US GOMShellEarl
r 2011Earl
Dec 2014352
Noble Driller
1976/20075,000'US GOMShellLate Jul 2011Earl
375Plus five one-
Noble Lorris Bouzi
1975/20034,000' US GOMShi
ardEarl
-Cold Stacked.
US GOMShell
US GOMShell
422Contract is at a fixed dayrate the first five years and is eligible for a 15% performance bonus. During the second five yea
Noble Bully I (f)GustoMSC Bully PRD 1200020118,200'-DP
ShellLate Mar 2012Late Mar 2017469Plus four 1-year priced options.
Discoverer Class1976/20091,000'Seattle/Chukchi Se
Mar 2012Late Feb 2014240
Noble Joe AlfordPace Marine 85G1982/200670’-CUS GOMShi
ardMid Se
-
Cold Stacked.
Earl
Cold Stacked.
Noble Bill JenningsMLT Class 84-E.R.C. 1975/1997390’-ICBay of CampechePemexEarly Apr 2012
1121,068 day contract.
Noble Eddie PaulMLT Class 84-E.R.C. 1976/1995390’-ICShipyardEarly Apr 2012Late Apr 2012-
Bay of CampechePemexLate Apr 2012
1,342
Noble Leonard JonesMLT Class 53-E.R.C. 1972/1998390’-ICBay of CampecheShipyardMid Dec 2011Mid Apr 2012-On 1/02/2012 the rig enc
Bay of CampechePemexMid Apr 2012Mid Apr 20151121,084 day contract.
F&G L-780 MOD II1982/1998300’-ICBa
PemexMid Se
t 2011Mid Jul 201
821,039 da
Noble Johnnie Hoffma
Baker Marine BMC 300 1976/1993300’-ICBa
PemexLate Ma
2011Late Dec 201280
ston Class 111-C 1977/1996300’-ICBa
PemexLate Feb 2012Late Jun 201
Noble John Sandife
ston Class 111-C 1975/1995300’-ICBa
PemexMid A
r 2011Late Dec 201283
Noble Lewis Dugger Levingston Class 111-C 1977/1997300’-ICBa
Dec 201283
Noble Sam NobleLevingston Class 111-C 1982300’-ICShipyardEarly Feb 2012
-Anticipate +/- 90 days of downtime in 1Q2012 / 2Q2012 for maintenance and regulatory inspections.
Bay of CampechePemex
2012Late
90881 day contract.
MLT Class 82-SD-C 1979/1999250’-ICBa
ardEarl
Noble Tom Job
MLT Class 82-SD-C 1982250’-ICShi
ardEarl
Noble Carl NorbergMLT Class 82-C1976/2003250'-ICBa
PemexLate Dec 2011Late Au
201468967 da
290
Rig to be paid $290k per day until its departure to Australia.
Experienced 28 days of operational downtime during 2Q2012.
In-transitShipyard
2012Late
-Mobilization and contract preparation.
AustraliaShell
2012Late
417Eligible for a maximum of 17% performance bonus.
Noble EVA 4000™1980/19997,000'US GOMShi
ardEarl
Maintenance and re
US GOMShellEarly May 2012Late Jun 2012125
US GOM/BrazilShellEarly July 2012Early Dec 2012170
BrazilShellEarly Dec 2012Early Dec 2015407
Noble Therald Martin
Penta
270Eli
Noble Bully II (f) - NewbuildGustoMSC Bully PRD 1200020118,200'-DPBrazilShellMid Apr 2012Mid Apr 2022
347
Eligible for a maximum of 15% performance bonus.
Late Feb
90
s are expected to be paid at
da
Early Dec
347
Eli
-Rig currently undergoing regulatory inspection and sea trials.
Late Nov 2016302Eligible for a maximum of 15% performance bonus.
Early May 2015290Eligible for a maximum of 15% performance bonus.
Noble PhoenixGusto Engineering Pelican Class1979/20095,000' DPShipyard & In-transit &
NobleMid Mar 2011
-Noble Phoenix will be swapped for
Offshore Co. SCP III Mark 2 1979/20001,500'United Kin
Dec 2010Earl
United Kingdom
Mid Apr 2009Mid May 2012505
2012Mid Oct 2012325
IsraelAGRMid Oct 2012
415
One well, estimated +/- 79 days
Early Apr 2013415
Noble EVA 4000™ 1981/19986,000'E
GSPCEarl
Dec 2011Earl
325Six well contract, estimated +/- 183 da
Noble Hans DeulF&G JU-2000E2009400'-ICUnited Kin
ShellEarl
Feb 2011Earl
Noble Julie RobertsonBaker Marine Europe Class1981/2001 390'-IC (e)United KingdomCentricaLate Mar 2012Late Mar 2013118
TotalEarl
Dec 2011Earl
NobleShipyard
2012Mid
-Anticipate +/- 30 days of downtime in 2Q 2012 for regulatory inspection.
United KingdomCentrica
2012Mid
91Three well contract, estimated +/- 120 days.
United KingdomCentrica
2012Mid
122
Noble L
DanaEarl
r 2011Earl
Mid Jan 2012Earl
105Two well contract, estimated +/- 140 da
DanaEarl
Late Mar 2013125
WintershallEarl
Late Dec 2012115
F&G L-780 MOD II1981/1995300’-ICNi
eriaExxonMobilLate Oct 2011Late Jun 201285
F&G L-780 MOD II1982/2003300’-ICMulti
2012100Four well contract, estimated +/- 250 da
Noble Ed NobleMLT Class 82-SD-C 1984/2003250’-ICNigeriaExxonMobilEarly Jul 2010Late Jun 201285
Noble Lloyd Noble MLT Class 82-SD-C 1983/1990250’-ICNigeriaExxonMobilLate Oct 2011
85Plus up to a 3-month priced option.
TBDShipyard
2012Mid
-Anticipate +/- 91 days of downtime for maintenance and regulatory inspection.
1982/1992150’-ICCameroonShi
ardMid Mar 2009-Cold stacked.
Noble Roger LewisF&G JU-2000E2007400'-ICSaudi ArabiaSaudi AramcoEarly Mar 2011Early Mar 2014132
Noble Scott MarksF&G JU-2000E2009400'-ICSaudi ArabiaSaudi AramcoEarly Jul 2011Early Jul 2014237
93Plus priced options: two wells, estimated up to 200-days, plus five workover wells, estimated up to 150 days.
RasGasEarl
72Contract is sub
Qata
RasGasEarl
80Two-
Noble Gus AndroesLevingston Class 111-C1982/2004300'-ICUAE (Hamriyah)ShipyardEarly Jan 2012
Anticipate +/-
149
Noble Harvey DuhaneyLevingston Class 111-C 1976/2001300'-ICQata
TotalEarl
r 201366Contract is sub
Noble George McLeodF&G L-780 MOD II1981/1995300’-IC
ShipyardEarly Jan 2012-Available.
Noble Charles CopelandMLT Class 82-SD-C1979/2001280’-ICUAE (Hamriyah)ShipyardLate Feb 2012Mid Jul 2012-Mobilization and contrac
Saudi ArabiaSaudi AramcoMid Jul 2012Mid Jul 201595
Noble Chuck SyringMLT Class 82-C 1976/1996250’-ICQatarMaerskLate Mar 2012Mid Sep 201258Accommodation work. Plus three, one-mont
Dhabi IIBaker Marine BMC 1501982/2006150'-ICUAE (Abu Dhabi)ADOCMid Jul 2011Mid Jul 201355
Noble Dick FavorBaker Marine BMC 1501982/2004150'-ICBahrainOXYLate Mar 2012
BahrainPTTEP
Jun
95
Noble DuchessConversion19751,500'SingaporeIn-transit/ShipyardMid Sept 2011
-Mobilization and contract preparation.
IndiaDeepwater Drilling/ONGC
Mid
180
1981/2003300’-ICIndi
Late Feb 2010Late Feb 201555Ri
Noble Charlie Yeste
MLT Class 116-C1980300’-ICIndi
50Ri
da
ShipyardJun 2013-
Jun 2013Oct 2013-
TBAShellNov 2013Oct 2023410Contract is at a fixed dayrate the first five years and is eligible for a 15% performance bonus. Du
Noble Don Taylor
Gusto P10,0002013
12,000'-DPKorea
Shipyard2Q 2013
In-transit & acceptance testing2Q 20132nd Half of 2013TBA
Gusto P10,000201312,000'-DPKoreaShipyard4Q 2013
4Q 2013TB
Gusto P10,0002014
12,000'-DPKorea
Shipyard2Q 2014
In-transit & acceptance testing2Q 2014TBA
Gusto P10,000201412,000'-DPKoreaShi
ard2nd Half of 2014
2nd Half of 2014TB
F&G JU-3000N2012400'-ICJurongShipyard
In-transit & acceptance testing
1Q 2013
F&G JU-3000N2013400'-ICJurongShipyard2Q 2013
In-transit & acceptance testing3Q 2013TBA
F&G JU-3000N2013400'-ICJurongShipyard4Q 2013
In-transit & acceptance testing4Q 2013TBA
F&G JU-3000N2014400'-ICJurongShipyard1Q 2014
In-transit & acceptance testing1Q 2014TBA
F&G JU-3000N2014400'-ICJurongShipyard3Q 2014
In-transit & acceptance testing4Q 2014TBA
Noble Jackup VI - NewbuildF&G JU-3000N2014400'-ICJurongShipyard4Q 2014
In-transit & acceptance testing1Q 2015TBA
Noble Seillean - FPSOA1 Floating Production & Storage
1989/20086,500'-DPUS GOMLate Oct 2010-Available. The unit is currently warm stacked.
(a)Unit has been upgraded to the NC-5SM mooring standard.
(b) Rig utilizes the Aluminum Alloy Riser technology.
(d)Listed rigs are modified bareboat charter; cost structure varies by region.
(e)Leg extensions fabricated to enable the rig to operate in up to 390' of water in a non-harsh environment.
stimated as downtime.
ell as certain operational support costs. The term of the contracts will be extended for a length of time equal to any suspensi
on period at the original contract dayrate.
The drilling contract provides the client with the right to terminate the contract in the event of excessive downtime. While w
e do not currently anticipate any cancellations as a
result of events that have occurred to date, clients may from time to time have the contractual right to do so, which is the ca
se with the drilling contracts for the
Noble Dave Beard
and the
Noble Paul Wolff.
However, we have not received any notification concerning contract cancellations to-date.